Pacific Northwest
Imported Portland cement for Washington and Oregon
Updated · Soku USA, Honolulu
The short answer
Soku USA quotes Vietnamese Portland cement and clinker landed at Pacific Northwest ports, including Seattle, Tacoma and Portland, on Pacific sailings that are shorter than our Gulf route. The US duty is Free plus a 12.5 percent Section 301 duty on Vietnamese entries since 24 July 2026. The practical question is how you will receive the cement: in our mapping, most West Coast cement import terminals are tied to cement producers, so an independent buyer usually needs its own silo, rented discharge capacity, or bagged and super-sack cargo in containers.
- Destinations
- Seattle, Tacoma, Portland and other Washington and Oregon ports
- Route
- Pacific sailing, shorter than our Gulf route
- US duty
- Free, plus 12.5 percent Section 301 on Vietnamese entries since 24 July 2026
- Terms
- FOB, or CFR and CIF where freight is available, against a documentary Letter of Credit
Who this is for
Ready-mix producers, precast makers, distributors and contractors in Washington and Oregon who want a second, qualified source of Portland cement or clinker, and who would rather see freight and duty in the number than discover them later.
How the cement gets to the Northwest
Cargo loads at Cam Pha, Hai Phong or Nghi Son, Vietnam's primary deep-water cement and clinker terminals, and crosses the Pacific. These are Pacific sailings, the same family of routes as Hawaii and the rest of the West Coast. Documented shipments from Vietnam to the US Gulf run about five to six weeks, and West Coast routes are shorter. We confirm the transit for your port when we quote.
Most Vietnamese mills sell FOB and expect a wire before the cargo moves, which leaves you finding a vessel and paying up front. We quote FOB, CFR or CIF, and we sell against a documentary Letter of Credit with Soku as beneficiary, so you pay your own bank against documents on terms you already use.
The real constraint is receiving the cement
In our 2026 mapping of US West Coast cement terminals, nearly every seaborne terminal is owned by, or supply-tied to, a cement producer. Those terminals buy from their parent. For an independent buyer, how you will receive the cement needs an answer before the price does.
There are three practical routes:
- Your own receiving. A silo, a discharge method (grab or pneumatic) and truck load-out. This suits large, steady demand and is the lowest cost per ton at vessel scale.
- Rented discharge. Some independent port operators discharge bulk cement into silos as a paid service. Ask early, because it shapes berth planning and how the voyage is quoted.
- Containers. Lined super sacks (1.0, 1.5 or 2.0 MT) or palletized 60 lb and 50 kg bags move by container. You need a forklift or crane and covered, dry storage. This fits parcels below the vessel crossover.
A geared Supramax lifts roughly 50,000 tonnes in a single call and is usually the lowest cost per ton at that scale. Charter hire is priced on vessel days rather than cargo weight, so a part cargo pays for space it does not use. Below about 25,000 tonnes, breakbulk or containerized shipping is generally the better fit.
What duty applies to Vietnamese cement entering the US?
Cement clinker (HTS 2523.10.00.00) and grey Portland cement (HTS 2523.29.00.00) carry a Column 1 general NTR rate of Free. A Section 301 action addressing forced labor, published at 91 FR 47318 (FR Doc 2026-15181, dockets USTR-2026-0265 and USTR-2026-0266), applies an additional 12.5 percent to products of Vietnam entered on or after 24 July 2026 under Chapter 99 heading 9903.05.84.
Cement is not among the exempted categories, so we price it in rather than around it. No US antidumping or countervailing duty order on Vietnamese cement or clinker is in effect; the historic US cement AD orders are against Japan and Mexico. Soku quotes are landed-cost with the current duty layer included, and classification is confirmed with a licensed customs broker before contract.
Public work in Washington and Oregon
On federal-aid work such as highways, harbors and airports, cement and cementitious materials are excluded materials under the Build America, Buy America rules (IIJA §70917(c), 2 CFR 184.3, applied by FHWA at 23 CFR 635.410), so imported cement does not need a federal waiver. That treatment does not override a state domestic-preference law, an owner's specification, or grant conditions, and a manufactured product containing the cement, such as precast, is assessed on its own.
Separately from Buy America, each state qualifies cement through its own approved-source process, backed by AASHTO-accredited mill laboratories (ASTM C1222), ASTM C150 or C595 conformance documentation and shipment-level certification. Several state specifications explicitly admit foreign mills that meet these requirements. Soku USA manages the approved-source application alongside your team, state by state.
Why a second source is worth having
US duty policy on cement sources has moved several times in two years, and the effective duty is the one in force on your entry date. A source on a different route and a different rule set gives you options when one of them shifts.
Supply is also allocated early. Argus reported that many Vietnamese suppliers were already sold out of spot cargoes for much of 2026 by February, which suggests most of the growth in US imports from Vietnam came from contracts agreed the year before. If you want Vietnamese cement for next season, the time to ask is well ahead of it.
How to ask for a Northwest quote
- Name the product and the specification, for example ASTM C150 Type I/II or Type IL.
- Give the volume and the format you can receive.
- Tell us the port or city where the cement will land, and whether you have a silo, a rented terminal or only covered storage.
- Say when you need the first delivery and whether a state approved-source listing is required.
We reply within one business day with a landed-cost number, and your broker confirms classification before contract.
Common questions
- Do you quote cement to Seattle, Tacoma and Portland?
- Yes. Tell us your port or city and your volume, and we price the actual route on FOB, CFR or CIF terms. Delivered terms depend on freight being available for your route, and on CFR and CIF the vessel is booked on the supply side while we coordinate the schedule and the documents.
- How long does shipping from Vietnam to the Pacific Northwest take?
- Typically several weeks by ocean freight, depending on the port pair. Documented shipments from Vietnam to the US Gulf run about five to six weeks, and West Coast routes are shorter. We confirm the transit for your port when we quote.
- Do I need my own cement terminal or silo?
- Not for every format. Bulk needs a terminal or silo and a discharge method. Lined super sacks need a forklift or crane and protected storage, and bagged cement needs covered, dry storage. Below roughly 25,000 tonnes, containerized or breakbulk shipping is generally the better fit anyway.
- What import duty applies to Vietnamese cement entering Washington or Oregon?
- Clinker (HTS 2523.10.00.00) and grey Portland cement (HTS 2523.29.00.00) have a Column 1 general rate of Free, plus an additional 12.5 percent Section 301 duty on products of Vietnam entered on or after 24 July 2026 under heading 9903.05.84. Classification is confirmed with a licensed customs broker before contract.
Sources
- Federal Register, Notice of Actions in Section 301 Investigations (FR Doc 2026-15181, 91 FR 47318, 28 July 2026)
- US Customs and Border Protection, CSMS guidance: Section 301 Forced Labor Import Duties
- USITC Harmonized Tariff Schedule: heading 2523, Portland cement and clinkers
- 2 CFR 184.3, Definitions (eCFR)
- 23 CFR 635.410, Buy America requirements (eCFR)
- Argus Media, US cement imports from Vietnam hit record in 1H (25 August 2026)